10:35 – 10:50 & 04:35 – 04:50

BIM in Infrastructure – parametric tunnel modelling with Allplan Bridge

 


 

About the Speaker

 


Philipp Kiziridis, Design Engineer - Underground Geotechnical Engineering Department, Gähler und Partner AG, Switzerland

Philipp Kiziridis has experienced the changes in planning during more than 20 years of professional activity in the fields of bridge construction, structural engineering and tunnel construction. Originally still drawing plans with drawing utensils and ink, he has become acquainted with various programs for 2D and 3D design with digitization. New developments, such as BIM integration in infrastructure projects, are the challenges of everyday life for him. With the assignment to model a 1000m long tunnel in LoG300, he was looking for a way to build the model parametrically and the first models have now been created by using Allplan Bridge.