Efficient Workflow
with Allplan Bridge

 

Planning Tendnon Stressing sequence

A stressing sequence can be defined for each tendon specified in the model. Stressing, wedge slip, and releasing are available actions. These actions are carried out at the begin of the tendon, at the end, or at both sides simultaneously.

To optimize the management of tendon stressing, the sequences of stressing actions are stored as named “stress groups”. The tendons are assigned to the corresponding group via Drag & Drop, and automatically stressed in accordance with the group definition. In addition, the values can be adjusted individually for each tendon.

  • Easy management by using tendon groups